13 Emerson Street: Securing the buildings

The three building sections: left, middle and right wall were originally meant to go on top of the base, then I would place the sidewalk or pavement sections in front.




However, it became clear once I placed them that it would cause problems since the base of the right wall had a protruding edge (door, see photo above) that would mean awkwardly cutting around it and exposing a strange discrepancy between surfaces.


So I opted to have them on top of the same surface:




Once the layer was primed, I glued it on. Then I attached the buildings to it and secured them with backing supports.


Next: finishing the exterior details

  • Facebook
  • Instagram
  • Pinterest
  • Erik Goddard

© 2020 Erik Goddard