top of page

2nd floor details

As the bedrooms edged toward the finish line, there was some detail work on the other parts of the upper level as well. Here you can see the skylight allowing light into the bathroom:

ree

ree


Here the start of the two dormers are installed on the front roof. You can see the hinges which allow the left side and right side of the roof to be lifted for interior access.

ree

This shot shows the cut area in the wall where the dormer windows will fit.

ree

Meanwhile, the stuff on this end of the house is starting to look more like a chimney.

ree

Here's how the house looks before the roof panels got installed. The left panel covers both the left bedroom and the hallway, while the right takes care of.... you got it.

ree

Comments


Erik Goddard
bottom of page